Ramp B-3 over Dry Run Creek
Fair Condition19 years old6,000 vehicles/day
Location
| State | Illinois |
| County | Peoria |
| Location | Us150 I74 Rmp Peoria |
| Carries | Ramp B-3 |
| Crosses | Dry Run Creek |
| Coordinates | 40.74149, -89.62600 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 5 (Fair) |
| Culvert | 5 (Fair) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Culvert |
| Total Length | 41.0 ft (12.5 m) |
| Max Span | 18.7 ft (5.7 m) |
| Deck Area | 61.2 sq m |
| Main Spans | 2 |
| Year Built | 2007 |
Traffic
| Avg Daily Traffic | 6,000 (2022) |
| Truck Traffic | 5% |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | 223 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 072203000000000 |