Fas 531(ch 4) over Camp Creek Drain Dit

Fair Condition38 years old2,150 vehicles/day

Location

StateIllinois
CountyPiatt
Location4.1 Mi E Monticello
CarriesFas 531(ch 4)
CrossesCamp Creek Drain Dit
Coordinates40.02541, -88.49813

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure5 (Fair)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignSlab
Total Length67.9 ft (20.7 m)
Max Span24.9 ft (7.6 m)
Deck Width34.1 ft (10.4 m)
Deck Area215.3 sq m
Main Spans3
Year Built1988

Traffic

Avg Daily Traffic2,150 (2020)
Truck Traffic7%
Lanes On Bridge2

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number074323500000000

Nearby Bridges