WB Cd To Il3 SB "0 over Ground
Fair Condition55 years old23,900 vehicles/day
Location
| State | Illinois |
| County | St. Clair |
| Location | Psc Abut 0-11->p-017 |
| Carries | WB Cd To Il3 SB "0 |
| Crosses | Ground |
| Coordinates | 38.61511, -90.17132 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Girder and Floorbeam |
| Total Length | 616.1 ft (187.8 m) |
| Max Span | 120.1 ft (36.6 m) |
| Deck Width | 27.9 ft (8.5 m) |
| Deck Area | 1596.3 sq m |
| Main Spans | 6 |
| Year Built | 1971 (reconstructed 2004) |
Traffic
| Avg Daily Traffic | 23,900 (2023) |
| Truck Traffic | 13% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 082014300000000 |