N Main ST / Fau 92 over Fai 64
Good Condition54 years old5,300 vehicles/day
Location
| State | Illinois |
| County | St. Clair |
| Location | 1/2 Mi S Of US 50 |
| Carries | N Main ST / Fau 92 |
| Crosses | Fai 64 |
| Coordinates | 38.57444, -89.88668 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 197.2 ft (60.1 m) |
| Max Span | 97.4 ft (29.7 m) |
| Deck Width | 45.9 ft (14 m) |
| Deck Area | 841.4 sq m |
| Main Spans | 2 |
| Year Built | 1972 (reconstructed 2005) |
Traffic
| Avg Daily Traffic | 5,300 (2023) |
| Truck Traffic | 4% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 223 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 082018200000000 |