Ch 28 N Pawnee RD over Brush Creek
Good Condition65 years old1,050 vehicles/day
Location
| State | Illinois |
| County | Sangamon |
| Location | 3.0 Mi W New City |
| Carries | Ch 28 N Pawnee RD |
| Crosses | Brush Creek |
| Coordinates | 39.66087, -89.59144 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 151.6 ft (46.2 m) |
| Max Span | 50.2 ft (15.3 m) |
| Deck Width | 26.9 ft (8.2 m) |
| Deck Area | 378.8 sq m |
| Main Spans | 3 |
| Year Built | 1961 (reconstructed 2011) |
Traffic
| Avg Daily Traffic | 1,050 (2022) |
| Truck Traffic | 4% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 321 |
| Inspection Frequency | Every 48 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 084303700000000 |