US 51 (fap 322) over Opossum Creek
Fair Condition41 years old3,150 vehicles/day
Location
| State | Illinois |
| County | Shelby |
| Location | 3 Mi S Christian Lin |
| Carries | US 51 (fap 322) |
| Crosses | Opossum Creek |
| Coordinates | 39.30375, -89.08574 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 124.7 ft (38 m) |
| Max Span | 41.0 ft (12.5 m) |
| Deck Width | 34.8 ft (10.6 m) |
| Deck Area | 402.8 sq m |
| Main Spans | 3 |
| Year Built | 1985 |
Traffic
| Avg Daily Traffic | 3,150 (2023) |
| Truck Traffic | 20% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 087002500000000 |