Loran Rd. over Plum Cr. Br.
Poor Condition92 years old200 vehicles/day
Location
| State | Illinois |
| County | Stephenson |
| Location | 5.5 Mi SW Pearl City |
| Carries | Loran Rd. |
| Crosses | Plum Cr. Br. |
| Coordinates | 42.22215, -89.91741 |
Condition Ratings
| Overall Condition | Poor |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 4 (Poor) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 39.0 ft (11.9 m) |
| Max Span | 12.1 ft (3.7 m) |
| Deck Area | 80.9 sq m |
| Main Spans | 3 |
| Year Built | 1934 |
Traffic
| Avg Daily Traffic | 200 (2024) |
| Truck Traffic | 7% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2023 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 089501000000000 |