Il 8/ Il 116 over Tazewell & Peoria Rr
Poor Condition60 years old11,800 vehicles/day
Location
| State | Illinois |
| County | Tazewell |
| Location | Cedar ST Extension |
| Carries | Il 8/ Il 116 |
| Crosses | Tazewell & Peoria Rr |
| Coordinates | 40.66565, -89.58596 |
Condition Ratings
| Overall Condition | Poor |
| Deck | 4 (Poor) |
| Superstructure | 4 (Poor) |
| Substructure | 2 (Critical) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 706.0 ft (215.2 m) |
| Max Span | 213.9 ft (65.2 m) |
| Deck Width | 63.3 ft (19.3 m) |
| Deck Area | 4153.4 sq m |
| Main Spans | 6 |
| Year Built | 1966 |
Traffic
| Avg Daily Traffic | 11,800 (2021) |
| Truck Traffic | 8% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | December 2023 |
| Inspection Frequency | Every 12 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 090003400000000 |