Il 1 US 150 (fap 3 over 14th St(fau 7010)
Fair Condition60 years old24,700 vehicles/day
Location
| State | Illinois |
| County | Vermilion |
| Location | At S Edge Danville |
| Carries | Il 1 US 150 (fap 3 |
| Crosses | 14th St(fau 7010) |
| Coordinates | 40.10176, -87.63585 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 141.1 ft (43 m) |
| Max Span | 37.7 ft (11.5 m) |
| Deck Width | 92.5 ft (28.2 m) |
| Deck Area | 1212.6 sq m |
| Main Spans | 4 |
| Year Built | 1966 (reconstructed 1996) |
Traffic
| Avg Daily Traffic | 24,700 (2023) |
| Truck Traffic | 9% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 092003900000000 |