US 150(fap 729) over N Fork Vermilion Riv

Fair Condition76 years old12,500 vehicles/day

Location

StateIllinois
CountyVermilion
LocationIn Danville
CarriesUS 150(fap 729)
CrossesN Fork Vermilion Riv
Coordinates40.12437, -87.63993

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length500.0 ft (152.4 m)
Max Span129.9 ft (39.6 m)
Deck Width69.9 ft (21.3 m)
Deck Area3246.1 sq m
Main Spans4
Year Built1950 (reconstructed 1993)

Traffic

Avg Daily Traffic12,500 (2023)
Truck Traffic8%
Lanes On Bridge4
Lanes Under Bridge4

Inspection & Ownership

Last Inspection125
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number092005300000000

Nearby Bridges