Essington Road over Sunnyland Drain Chan
Good Condition16 years old16,800 vehicles/day
Location
| State | Illinois |
| County | Will |
| Location | 100 S Hennepin DR |
| Carries | Essington Road |
| Crosses | Sunnyland Drain Chan |
| Coordinates | 41.57304, -88.16202 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 8 (Very Good) |
| Culvert | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 22.0 ft (6.7 m) |
| Max Span | 6.6 ft (2 m) |
| Deck Area | 134.7 sq m |
| Main Spans | 3 |
| Year Built | 2010 |
Traffic
| Avg Daily Traffic | 16,800 (2023) |
| Truck Traffic | 3% |
| Lanes On Bridge | 6 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 099646900000000 |