30th ST over Massachusetts Conrail

Fair Condition57 years old11,512 vehicles/day

Location

StateIndiana
CountyMarion
Location00.10 W Of Emerson AVE
Carries30th ST
CrossesMassachusetts Conrail
Coordinates39.81025, -86.08544

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure5 (Fair)
Substructure6 (Satisfactory)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length260.8 ft (79.5 m)
Max Span81.7 ft (24.9 m)
Deck Width73.5 ft (22.4 m)
Deck Area1780.8 sq m
Main Spans4
Year Built1969 (reconstructed 1999)

Traffic

Avg Daily Traffic11,512 (2019)
Truck Traffic5%
Lanes On Bridge4
Lanes Under Bridge2

Inspection & Ownership

Last Inspection824
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number4900150

Nearby Bridges