42nd Street over Steele Ditch
Fair Condition52 years old958 vehicles/day
Location
| State | Indiana |
| County | Marion |
| Location | 00.17 E Of German Church |
| Carries | 42nd Street |
| Crosses | Steele Ditch |
| Coordinates | 39.83390, -85.96868 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 102.7 ft (31.3 m) |
| Max Span | 39.7 ft (12.1 m) |
| Deck Width | 31.2 ft (9.5 m) |
| Deck Area | 297.4 sq m |
| Main Spans | 3 |
| Year Built | 1974 (reconstructed 1993) |
Traffic
| Avg Daily Traffic | 958 (2019) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 4900174 |