Tok Cutoff over Gakona River
Good Condition16 years old410 vehicles/day
Location
| State | Alaska |
| County | County 066 |
| Location | Mile Point 1.8 |
| Carries | Tok Cutoff |
| Crosses | Gakona River |
| Coordinates | 62.30139, -145.30722 |
Condition Ratings
| Overall Condition | Good |
| Deck | 9 (Excellent) |
| Superstructure | 9 (Excellent) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 336.0 ft (102.4 m) |
| Max Span | 111.9 ft (34.1 m) |
| Deck Width | 39.0 ft (11.9 m) |
| Deck Area | 1218.6 sq m |
| Main Spans | 3 |
| Year Built | 2010 |
Traffic
| Avg Daily Traffic | 410 (2020) |
| Truck Traffic | 21% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 723 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 0646 |