IRR BIA RTE 55 over Y31 Canyon
Fair Condition52 years old100 vehicles/day
Location
| State | Arizona |
| County | Navajo |
| Location | 11.4km SE Of White River |
| Carries | IRR BIA RTE 55 |
| Crosses | Y31 Canyon |
| Coordinates | 33.82106, -109.88906 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Culvert |
| Total Length | 33.5 ft (10.2 m) |
| Max Span | 5.9 ft (1.8 m) |
| Deck Width | 66.9 ft (20.4 m) |
| Deck Area | 208.1 sq m |
| Main Spans | 4 |
| Year Built | 1974 |
Traffic
| Avg Daily Traffic | 100 (2024) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | Bureau of Indian Affairs |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000000H095 |