US 65 NB over NE 27th AVE & Bike Path
Good Condition32 years old14,300 vehicles/day
Location
| State | Iowa |
| County | Polk |
| Location | 3.3 Miles S Of Jct I-80 |
| Carries | US 65 NB |
| Crosses | NE 27th AVE & Bike Path |
| Coordinates | 41.61823, -93.49315 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 201.1 ft (61.3 m) |
| Max Span | 96.1 ft (29.3 m) |
| Deck Width | 43.0 ft (13.1 m) |
| Deck Area | 803.0 sq m |
| Main Spans | 3 |
| Year Built | 1994 |
Traffic
| Avg Daily Traffic | 14,300 (2022) |
| Truck Traffic | 15% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000601365 |