I-40 EB over Manila Wash
Fair Condition57 years old11,789 vehicles/day
Location
| State | Arizona |
| County | Navajo |
| Location | 14.6 Mi E Jct SR 87 |
| Carries | I-40 EB |
| Crosses | Manila Wash |
| Coordinates | 34.96500, -110.40780 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 7 — Countermeasures installed |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 111.9 ft (34.1 m) |
| Max Span | 29.9 ft (9.1 m) |
| Deck Width | 43.3 ft (13.2 m) |
| Deck Area | 450.1 sq m |
| Main Spans | 4 |
| Year Built | 1969 |
Traffic
| Avg Daily Traffic | 11,789 (2021) |
| Truck Traffic | 45% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00851 |