Chuichu RD over I8
Fair Condition59 years old2,417 vehicles/day
Location
| State | Arizona |
| County | Pinal |
| Location | 4.8 Mi W Of Jct I10 |
| Carries | Chuichu RD |
| Crosses | I8 |
| Coordinates | 32.82770, -111.75740 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 255.9 ft (78 m) |
| Max Span | 78.1 ft (23.8 m) |
| Deck Width | 35.1 ft (10.7 m) |
| Deck Area | 834.6 sq m |
| Main Spans | 4 |
| Year Built | 1967 |
Traffic
| Avg Daily Traffic | 2,417 (2022) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 01197 |