I 19; NB over Anaconda Pipeline
Good Condition55 years old21,137 vehicles/day
Location
| State | Arizona |
| County | Pima |
| Location | 0.6 Mi N Jct Nogales HWY |
| Carries | I 19; NB |
| Crosses | Anaconda Pipeline |
| Coordinates | 31.91331, -110.98567 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 67.9 ft (20.7 m) |
| Max Span | 24.9 ft (7.6 m) |
| Deck Width | 44.6 ft (13.6 m) |
| Deck Area | 281.5 sq m |
| Main Spans | 3 |
| Year Built | 1971 |
Traffic
| Avg Daily Traffic | 21,137 (2021) |
| Truck Traffic | 17% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 01568 |