I-10 EB On Ramp over Cushing Street
Good Condition17 years old12,540 vehicles/day
Location
| State | Arizona |
| County | Pima |
| Location | 1.6 Mi N Jct I-19 |
| Carries | I-10 EB On Ramp |
| Crosses | Cushing Street |
| Coordinates | 32.21750, -110.98000 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 231.0 ft (70.4 m) |
| Max Span | 85.0 ft (25.9 m) |
| Deck Width | 35.1 ft (10.7 m) |
| Deck Area | 753.3 sq m |
| Main Spans | 3 |
| Year Built | 2009 |
Traffic
| Avg Daily Traffic | 12,540 (2022) |
| Truck Traffic | 9% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 3 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 02856 |