I-24 over P&l Rr-pool Rd- Shdmn R
Fair Condition51 years old22,743 vehicles/day
Location
| State | Kentucky |
| County | McCracken |
| Location | Ebl 3 Mi SE Of Us45 Ntrch |
| Carries | I-24 |
| Crosses | P&l Rr-pool Rd- Shdmn R |
| Coordinates | 37.02472, -88.61056 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 457.7 ft (139.5 m) |
| Max Span | 98.4 ft (30 m) |
| Deck Width | 43.6 ft (13.3 m) |
| Deck Area | 1855.3 sq m |
| Main Spans | 5 |
| Year Built | 1975 |
Traffic
| Avg Daily Traffic | 22,743 (2023) |
| Truck Traffic | 23% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 073B00114R |