AVE Pastor over Josephine Canyon
Good Condition47 years old110 vehicles/day
Location
| State | Arizona |
| County | Santa Cruz |
| Location | 2.7 Mi E Pendelton DR |
| Carries | AVE Pastor |
| Crosses | Josephine Canyon |
| Coordinates | 31.57040, -110.99350 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 153.9 ft (46.9 m) |
| Max Span | 75.1 ft (22.9 m) |
| Deck Width | 33.5 ft (10.2 m) |
| Deck Area | 478.4 sq m |
| Main Spans | 2 |
| Year Built | 1979 |
Traffic
| Avg Daily Traffic | 110 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 08485 |