I 90 EB & Rp1anb over HWY Sr-14
Good Condition23 years old
Location
| State | Massachusetts |
| County | Suffolk |
| Location | Segment 1 |
| Carries | I 90 EB & Rp1anb |
| Crosses | HWY Sr-14 |
| Coordinates | 42.37418, -71.02950 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Single/Spread |
| Total Length | 442.9 ft (135 m) |
| Max Span | 163.1 ft (49.7 m) |
| Deck Width | 49.9 ft (15.2 m) |
| Deck Area | 2,052 sq m |
| Year Built | 2003 |
Traffic
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | B1658658KMPANBI |