HWY S Bos Bps RD over Other Relief
Fair Condition28 years old19,138 vehicles/day
Location
| State | Massachusetts |
| County | Suffolk |
| Location | At Frontage RD NB |
| Carries | HWY S Bos Bps RD |
| Crosses | Other Relief |
| Coordinates | 42.33402, -71.06326 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 139.8 ft (42.6 m) |
| Max Span | 70.9 ft (21.6 m) |
| Deck Width | 63.3 ft (19.3 m) |
| Deck Area | 822.2 sq m |
| Main Spans | 2 |
| Year Built | 1998 |
Traffic
| Avg Daily Traffic | 19,138 (2025) |
| Truck Traffic | 19% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | B16644928DOTNBI |