I 93 Hov Ramp EB over Rr Amtrak
Fair Condition24 years old3,399 vehicles/day
Location
| State | Massachusetts |
| County | Suffolk |
| Location | 0.8 Km S. Of I-90 EB |
| Carries | I 93 Hov Ramp EB |
| Crosses | Rr Amtrak |
| Coordinates | 42.34568, -71.06008 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Single/Spread |
| Total Length | 70.9 ft (21.6 m) |
| Max Span | 70.9 ft (21.6 m) |
| Deck Width | 42.3 ft (12.9 m) |
| Deck Area | 278.6 sq m |
| Main Spans | 1 |
| Year Built | 2002 |
Traffic
| Avg Daily Traffic | 3,399 (2023) |
| Truck Traffic | 17% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | B1666992KDOTNBI |