ST 2 Mohawk Trail over Comb River Rd&conn Riv
Fair Condition95 years old10,560 vehicles/day
Location
| State | Massachusetts |
| County | Franklin |
| Location | Mm 56.2 On ST 2 |
| Carries | ST 2 Mohawk Trail |
| Crosses | Comb River Rd&conn Riv |
| Coordinates | 42.59786, -72.49661 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 5 (Fair) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel Continuous |
| Design | Arch - Deck |
| Total Length | 866.1 ft (264 m) |
| Max Span | 460.0 ft (140.2 m) |
| Deck Width | 49.5 ft (15.1 m) |
| Deck Area | 3986.4 sq m |
| Main Spans | 3 |
| Year Built | 1931 (reconstructed 1992) |
Traffic
| Avg Daily Traffic | 10,560 (2023) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is eligible for the National Register |
| Structure Number | E100140UCDOTNBI |