ST 3 Pilgrim HWY over HWY Landing RD
Fair Condition71 years old55,678 vehicles/day
Location
| State | Massachusetts |
| County | Plymouth |
| Location | 2 M N Of Plymouth Tl |
| Carries | ST 3 Pilgrim HWY |
| Crosses | HWY Landing RD |
| Coordinates | 41.99822, -70.72152 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 113.8 ft (34.7 m) |
| Max Span | 44.9 ft (13.7 m) |
| Deck Width | 104.0 ft (31.7 m) |
| Deck Area | 1100.0 sq m |
| Main Spans | 3 |
| Year Built | 1955 (reconstructed 1979) |
Traffic
| Avg Daily Traffic | 55,678 (2023) |
| Truck Traffic | 11% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | K01010AF0DOTNBI |