75th Avenue over Az Canal Diversion Chnl
Fair Condition41 years old20,802 vehicles/day
Location
| State | Arizona |
| County | Maricopa |
| Location | 0.4 Mi S Jct Bell RD |
| Carries | 75th Avenue |
| Crosses | Az Canal Diversion Chnl |
| Coordinates | 33.63180, -112.22000 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 466.9 ft (142.3 m) |
| Max Span | 118.1 ft (36 m) |
| Deck Width | 83.0 ft (25.3 m) |
| Deck Area | 3600.2 sq m |
| Main Spans | 4 |
| Year Built | 1985 |
Traffic
| Avg Daily Traffic | 20,802 (2024) |
| Truck Traffic | 5% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 09923 |