Alvernon Way over 34-36 Connection

Good Condition42 years old6,660 vehicles/day

Location

StateArizona
CountyPima
Location0.3 Mi S Jct 29th ST
CarriesAlvernon Way
Crosses34-36 Connection
Coordinates32.19490, -110.91070

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Single/Spread
Total Length74.1 ft (22.6 m)
Max Span68.9 ft (21 m)
Deck Width31.2 ft (9.5 m)
Deck Area214.7 sq m
Main Spans1
Year Built1984

Traffic

Avg Daily Traffic6,660 (2022)
Truck Traffic5%
Lanes On Bridge2
Lanes Under Bridge2

Inspection & Ownership

Last Inspection323
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number09974

Nearby Bridges