ST 30 Main ST over Water Wach Aqueduct
Fair Condition64 years old5,562 vehicles/day
Location
| State | Massachusetts |
| County | Worcester |
| Location | .2 Mi. E. Of I-495 |
| Carries | ST 30 Main ST |
| Crosses | Water Wach Aqueduct |
| Coordinates | 42.30741, -71.55861 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 24.9 ft (7.6 m) |
| Max Span | 20.0 ft (6.1 m) |
| Deck Width | 45.9 ft (14 m) |
| Deck Area | 106.4 sq m |
| Main Spans | 1 |
| Year Built | 1962 |
Traffic
| Avg Daily Traffic | 5,562 (2023) |
| Truck Traffic | 6% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | S200201YTDOTNBI |