I-75 NB over Tebo Drain

Good Condition58 years old15,522 vehicles/day

Location

StateMichigan
CountyBay
Location7.0 Mi S Of Pinconning
CarriesI-75 NB
CrossesTebo Drain
Coordinates43.79735, -84.02107

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure8 (Very Good)
Substructure7 (Good)
Channel/Waterway6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length24.0 ft (7.3 m)
Max Span21.3 ft (6.5 m)
Deck Width49.2 ft (15 m)
Deck Area109.5 sq m
Main Spans1
Year Built1968 (reconstructed 2011)

Traffic

Avg Daily Traffic15,522 (2007)
Truck Traffic8%
Lanes On Bridge2

Inspection & Ownership

Last Inspection823
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000000000614

Nearby Bridges