New Nature AVE over Sturgeon River
Poor Condition126 years old25 vehicles/day
Location
| State | Michigan |
| County | Cheboygan |
| Location | Village Of Wolverine |
| Carries | New Nature AVE |
| Crosses | Sturgeon River |
| Coordinates | 45.27497, -84.60004 |
Condition Ratings
| Overall Condition | Poor |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 4 (Poor) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | Unknown |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 51.8 ft (15.8 m) |
| Max Span | 13.8 ft (4.2 m) |
| Deck Width | 12.1 ft (3.7 m) |
| Deck Area | 58.5 sq m |
| Main Spans | 3 |
| Year Built | 1900 (reconstructed 2019) |
Traffic
| Avg Daily Traffic | 25 (2015) |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 12 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000001562 |