Easterday AVE over I-75 NB

Fair Condition64 years old7,774 vehicles/day

Location

StateMichigan
CountyChippewa
LocationIn Sault Ste Marie
CarriesEasterday AVE
CrossesI-75 NB
Coordinates46.49171, -84.37083

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length228.3 ft (69.6 m)
Max Span69.6 ft (21.2 m)
Deck Width51.2 ft (15.6 m)
Deck Area1085.8 sq m
Main Spans4
Year Built1962 (reconstructed 2011)

Traffic

Avg Daily Traffic7,774 (2010)
Truck Traffic3%
Lanes On Bridge2
Lanes Under Bridge4

Inspection & Ownership

Last Inspection424
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000000001587

Nearby Bridges