I-69W To I-475N RM over I-475S On Rmp C

Good Condition56 years old8,800 vehicles/day

Location

StateMichigan
CountyGenesee
LocationIn Flint
CarriesI-69W To I-475N RM
CrossesI-475S On Rmp C
Coordinates43.01365, -83.68091

Condition Ratings

Overall ConditionGood
Deck8 (Very Good)
Superstructure8 (Very Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length137.1 ft (41.8 m)
Max Span132.9 ft (40.5 m)
Deck Width51.2 ft (15.6 m)
Deck Area652.1 sq m
Main Spans1
Year Built1970 (reconstructed 2022)

Traffic

Avg Daily Traffic8,800 (1988)
Truck Traffic7%
Lanes On Bridge3
Lanes Under Bridge2

Inspection & Ownership

Last Inspection424
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000000002664

Nearby Bridges