I-75 NB over Portage ST
Fair Condition66 years old2,555 vehicles/day
Location
| State | Michigan |
| County | Mackinac |
| Location | In ST Ignace Portage ST |
| Carries | I-75 NB |
| Crosses | Portage ST |
| Coordinates | 45.86668, -84.73454 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 137.1 ft (41.8 m) |
| Max Span | 56.4 ft (17.2 m) |
| Deck Width | 47.2 ft (14.4 m) |
| Deck Area | 601.9 sq m |
| Main Spans | 3 |
| Year Built | 1960 |
Traffic
| Avg Daily Traffic | 2,555 (2007) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000005950 |