I-675 NB over Weiss ST
Good Condition55 years old13,032 vehicles/day
Location
| State | Michigan |
| County | Saginaw |
| Location | In Saginaw At N Cty Lmts |
| Carries | I-675 NB |
| Crosses | Weiss ST |
| Coordinates | 43.44367, -83.95053 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 133.2 ft (40.6 m) |
| Max Span | 71.5 ft (21.8 m) |
| Deck Width | 57.7 ft (17.6 m) |
| Deck Area | 714.6 sq m |
| Main Spans | 3 |
| Year Built | 1971 (reconstructed 2009) |
Traffic
| Avg Daily Traffic | 13,032 (2017) |
| Truck Traffic | 6% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 3 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000009139 |