I-69 EB over Cox-doty Drain
Fair Condition44 years old7,134 vehicles/day
Location
| State | Michigan |
| County | St. Clair |
| Location | 2.7 Mi E Of Capac |
| Carries | I-69 EB |
| Crosses | Cox-doty Drain |
| Coordinates | 42.98719, -82.87358 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 7 — Countermeasures installed |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 79.7 ft (24.3 m) |
| Max Span | 79.7 ft (24.3 m) |
| Deck Width | 47.9 ft (14.6 m) |
| Deck Area | 354.8 sq m |
| Main Spans | 1 |
| Year Built | 1982 |
Traffic
| Avg Daily Traffic | 7,134 (2007) |
| Truck Traffic | 22% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000009945 |