S Gibraltar over Frank & Poet Drain
Good Condition34 years old2,929 vehicles/day
Location
| State | Michigan |
| County | Wayne |
| Location | Gibraltar E/jefferson |
| Carries | S Gibraltar |
| Crosses | Frank & Poet Drain |
| Coordinates | 42.08783, -83.20002 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 27.2 ft (8.3 m) |
| Max Span | 24.3 ft (7.4 m) |
| Deck Area | 70.5 sq m |
| Main Spans | 1 |
| Year Built | 1992 |
Traffic
| Avg Daily Traffic | 2,929 (1996) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000011994 |