Garlock Road over Butternut Creek
Good Condition10 years old850 vehicles/day
Location
| State | Michigan |
| County | Montcalm |
| Location | Bloomer Twp Sec 11 |
| Carries | Garlock Road |
| Crosses | Butternut Creek |
| Coordinates | 43.18086, -84.86127 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Single/Spread |
| Total Length | 40.0 ft (12.2 m) |
| Max Span | 38.7 ft (11.8 m) |
| Deck Width | 34.8 ft (10.6 m) |
| Deck Area | 129.3 sq m |
| Main Spans | 1 |
| Year Built | 2016 |
Traffic
| Avg Daily Traffic | 850 (2015) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000000013556 |