Division Avenue over Crippen Drain
Good Condition60 years old18,600 vehicles/day
Location
| State | Michigan |
| County | Kent |
| Location | 380 Ft N Of 60th Street |
| Carries | Division Avenue |
| Crosses | Crippen Drain |
| Coordinates | 42.85598, -85.66376 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 24.3 ft (7.4 m) |
| Max Span | 8.9 ft (2.7 m) |
| Deck Area | 151.0 sq m |
| Main Spans | 2 |
| Year Built | 1966 |
Traffic
| Avg Daily Traffic | 18,600 (2012) |
| Truck Traffic | 3% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000013856 |