Csah 15 over Chippewa River
Fair Condition71 years old5,000 vehicles/day
Location
| State | Minnesota |
| County | Chippewa |
| Location | In Montevideo |
| Carries | Csah 15 |
| Crosses | Chippewa River |
| Coordinates | 44.94814, -95.73009 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 3 — Scour critical |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 151.6 ft (46.2 m) |
| Max Span | 60.0 ft (18.3 m) |
| Deck Width | 54.5 ft (16.6 m) |
| Deck Area | 766.9 sq m |
| Main Spans | 3 |
| Year Built | 1955 (reconstructed 1989) |
Traffic
| Avg Daily Traffic | 5,000 (2012) |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 7017 |