County RD E-455 over Piper CR
Fair Condition28 years old1,369 vehicles/day
Location
| State | Missouri |
| County | Polk |
| Location | S 17 T 33 N R 22 W |
| Carries | County RD E-455 |
| Crosses | Piper CR |
| Coordinates | 37.58886, -93.35937 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 7 — Countermeasures installed |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 37.1 ft (11.3 m) |
| Max Span | 11.2 ft (3.4 m) |
| Deck Width | 21.3 ft (6.5 m) |
| Deck Area | 73.5 sq m |
| Main Spans | 3 |
| Year Built | 1998 |
Traffic
| Avg Daily Traffic | 1,369 (2024) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 28326 |