US 167 S-7 Lm 7.45 over Moro Creek Relief
Good Condition12 years old4,600 vehicles/day
Location
| State | Arkansas |
| County | Dallas |
| Location | 3.20 Mi No Jct SH 273 |
| Carries | US 167 S-7 Lm 7.45 |
| Crosses | Moro Creek Relief |
| Coordinates | 33.93224, -92.41860 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 121.1 ft (36.9 m) |
| Max Span | 45.9 ft (14 m) |
| Deck Width | 78.1 ft (23.8 m) |
| Deck Area | 878.2 sq m |
| Main Spans | 3 |
| Year Built | 2014 |
Traffic
| Avg Daily Traffic | 4,600 (2018) |
| Truck Traffic | 24% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 721 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000000007241 |