Mo 114 W over Drain Dtch

Good Condition16 years old1,189 vehicles/day

Location

StateMissouri
CountyStoddard
LocationS 20 T 25 N R 11 W
CarriesMo 114 W
CrossesDrain Dtch
Coordinates36.78761, -89.89232

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure8 (Very Good)
Substructure8 (Very Good)
Channel/Waterway6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Single/Spread
Total Length122.7 ft (37.4 m)
Max Span60.0 ft (18.3 m)
Deck Width29.9 ft (9.1 m)
Deck Area340.3 sq m
Main Spans3
Year Built2010

Traffic

Avg Daily Traffic1,189 (2024)
Truck Traffic23%
Lanes On Bridge2

Inspection & Ownership

Last InspectionOctober 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number33063