County RD 2025 over Trib Of Clear CR
Good Condition12 years old1 vehicles/day
Location
| State | Missouri |
| County | Vernon |
| Location | S 6 T 34 N R 30 W |
| Carries | County RD 2025 |
| Crosses | Trib Of Clear CR |
| Coordinates | 37.73056, -94.27086 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 9 (Excellent) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 40.7 ft (12.4 m) |
| Max Span | 39.0 ft (11.9 m) |
| Deck Width | 22.6 ft (6.9 m) |
| Deck Area | 85.6 sq m |
| Main Spans | 1 |
| Year Built | 2014 |
Traffic
| Avg Daily Traffic | 1 (2024) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 34761 |