RT C E over N Fk Mid Fabius Rv
Good Condition4 years old304 vehicles/day
Location
| State | Missouri |
| County | Schuyler |
| Location | S 18 T 66 N R 14 W |
| Carries | RT C E |
| Crosses | N Fk Mid Fabius Rv |
| Coordinates | 40.53167, -92.51944 |
Condition Ratings
| Overall Condition | Good |
| Deck | 9 (Excellent) |
| Superstructure | 9 (Excellent) |
| Substructure | 9 (Excellent) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 95.8 ft (29.2 m) |
| Max Span | 36.1 ft (11 m) |
| Deck Width | 26.6 ft (8.1 m) |
| Deck Area | 236.5 sq m |
| Main Spans | 3 |
| Year Built | 2022 |
Traffic
| Avg Daily Traffic | 304 (2024) |
| Truck Traffic | 12% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 36733 |