Fifth AVE over Pedes-bike Trail Aban

Good Condition3 years old2,000 vehicles/day

Location

StateMissouri
CountyBuchanan
LocationS 5 T 57 N R 35 W
CarriesFifth AVE
CrossesPedes-bike Trail Aban
Coordinates39.78783, -94.84675

Condition Ratings

Overall ConditionGood
Deck9 (Excellent)
Superstructure9 (Excellent)
Substructure9 (Excellent)
Scour CriticalNot applicable

Physical Characteristics

MaterialConcrete
DesignArch - Deck
Total Length32.2 ft (9.8 m)
Max Span28.9 ft (8.8 m)
Deck Width40.0 ft (12.2 m)
Deck Area119.6 sq m
Main Spans1
Year Built2023

Traffic

Avg Daily Traffic2,000 (2024)
Truck Traffic10%
Lanes On Bridge2

Inspection & Ownership

Last Inspection224
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number37139

Nearby Bridges