US 62 E over Drain Dtch #43
Fair Condition104 years old1,862 vehicles/day
Location
| State | Missouri |
| County | New Madrid |
| Location | S 7 T 22 N R 12 E |
| Carries | US 62 E |
| Crosses | Drain Dtch #43 |
| Coordinates | 36.55359, -89.79502 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 58.1 ft (17.7 m) |
| Max Span | 55.8 ft (17 m) |
| Deck Width | 25.9 ft (7.9 m) |
| Deck Area | 139.8 sq m |
| Main Spans | 1 |
| Year Built | 1922 (reconstructed 1939) |
Traffic
| Avg Daily Traffic | 1,862 (2024) |
| Truck Traffic | 18% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 4458 |