Mo 80 E over Main Drain Dtch #1
Fair Condition78 years old3,547 vehicles/day
Location
| State | Missouri |
| County | New Madrid |
| Location | S 29 T 25 N R 15 E |
| Carries | Mo 80 E |
| Crosses | Main Drain Dtch #1 |
| Coordinates | 36.78180, -89.45469 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 65.0 ft (19.8 m) |
| Max Span | 24.9 ft (7.6 m) |
| Deck Width | 24.6 ft (7.5 m) |
| Deck Area | 148.5 sq m |
| Main Spans | 3 |
| Year Built | 1948 |
Traffic
| Avg Daily Traffic | 3,547 (2024) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 12 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 6146 |