IRR BIA RTE 7 over Poplar River
Fair Condition24 years old481 vehicles/day
Location
| State | Montana |
| County | Roosevelt |
| Location | 2 Km S Of Poplar |
| Carries | IRR BIA RTE 7 |
| Crosses | Poplar River |
| Coordinates | 48.10825, -105.21294 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 254.6 ft (77.6 m) |
| Max Span | 125.0 ft (38.1 m) |
| Deck Width | 30.5 ft (9.3 m) |
| Deck Area | 721.7 sq m |
| Main Spans | 2 |
| Year Built | 2002 |
Traffic
| Avg Daily Traffic | 481 (2024) |
| Truck Traffic | 15% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | Bureau of Indian Affairs |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000000C622 |